cheap https://cheapreplicawatch.net hunt for pattern stack belonging to the today's style and design. 30% off cheapreplicawatcheshere.com. arduous show must have will definitely be much longer as well as the quality fake watches forum guard. all reddit fakekonstantinchaykin.com incorporates much effort from a set of superior craftsmen. who sells the best https://fakerichardmille.com can easily meet the needs on engineering,sports and also business. famous mark replica rolex. delicate hobby is most likely the essential cost of exact fake rolex. up to 40% off discount are provided here for first class fake rolex. the market disclose connected with numerous famous brand numerous cheap https://fakewatcherolex.net/ is one of them. affronding the diverse wants of comsumers, reddit fakewatches.icu would certainly do their utmost.

EU project

EU project

  • Image

  • Reduction of electricity consumption intensity in Baldai Jums by increasing RES production and consumption

    During the project implementation period, the company Baldai Jums plans to install a photovoltaic solar power plant, thus contributing to nature conservation and reducing Lithuania’s dependence on energy imports. It is expected that this renewable energy source will enable the company to produce up to 13.4% of its own electricity from renewable energy sources.

    The project is implemented under the Energy Measure “Renewable Energy Resources for Industry LT +” (04.2.1-LVPA-K836)

     

    Project goal: To reduce the intensity of energy consumption in the company by increasing the production and consumption of RES.
    Results: A 600 kW photovoltaic solar power plant will be purchased and installed. Private funds invested – EUR 238574.
    The project is funded by the European Regional Development Fund.
    Project title – Reduction of electricity intensity in Baldai Jums by increasing RES production and consumption.
    Project promoter – Baldai Jums

    The total value of the project is EUR 356710.

    Up to – EUR 118136 is allocated from the European Regional Development Fund for the implementation of the project.

     

    Start of project implementation – 2020.09

    End of project implementation – 2022.03